Wind energy projects in Latin America

Wind energy projects

CLIMB ASSIST equipment installed on a ladder at Coromuel Wind Farm.

October–December 2023

CLIMB ASSIST installation

Coromuel Wind Farm · Baja California, Mexico

The installation added a climb-assist device to the ladder inside the turbine.

Pitch cylinder on a Gamesa turbine.

September–November 2021

Pitch cylinder replacement

Gamesa · Costa Rica

The team replaced the cylinders in the system that controls blade pitch.

Cabin of the 3S LIFT service lift.Close-up of the lift attachment point.

Certified inspection and annual maintenance of 3S LIFT service lifts

Inspection and maintenance work covered 112 service lifts across three wind farms.

  • LAUDATO SI Wind FarmPenonomé, Panama · 2017, 2019 and 2024 · 86 lifts
  • Península Wind FarmMérida, Mexico · 2021 · 24 lifts
  • Amayo Wind FarmRivas, Nicaragua · 2022 · 2 lifts

Training at 3S LIFT Industry · Beijing, China · 2017

Platform surface before restoration.Platform after restoration.

August–September 2019

Restoration of platforms and main control cabinets

Goldwind Phase II · Penonomé, Coclé, Panama

Four technicians worked on the entrance platform, removing paint marks from the floor. The project also included refinishing the main control cabinets.

Wind turbine yaw brake calipers.

Dec–Feb 2015

Yaw brake caliper replacement

Goldwind Phase I · Penonomé, Coclé, Panama

The team replaced the brake calipers in the nacelle yaw system.

Tower interior as documented during cleaning.Opening in a platform inside the tower.

December 2014

Cleaning tower interiors

Goldwind Phase 1 · Penonomé, Coclé, Panama

Technicians with IRATA Level 1 and Level 2 rope access qualifications cleaned section T3 and part of section T2.

Structure and hoses of the installed environmental control system.Electrical connection and components of the environmental control system.

September–December 2014

Environmental control system installation

Goldwind Phase 1 · Penonomé, Coclé, Panama

The team welded the supporting structure and installed the dehumidifier, mist eliminator, sensors and electrical connections.

Equipment used to cut grooves in the yaw brake disc.Close-up of the disc during grooving.

September–October 2014

Yaw brake disc grooving

Goldwind Phase I · Penonomé, Panama

The team machined grooves into the nacelle yaw disc.

Other services provided

Wiring beside the turbine’s environmental control system.
Reference photo from the company profile · Environmental control system wiring.

Hot work to replace generator cable lugs

Close-up of bolts after corrosion treatment.
Reference photo from the company profile · Corrosion treatment on bolts.

500-hour and six-month maintenance on Goldwind GW 2.5 MW turbines

Electrical cabinets documented by MTSSA.
Reference photo from the company profile · Turbine electrical cabinets.

Phase One retrofit support for Goldwind Services Company Panama

The team assisted with replacing 185 mm power cables and upgrading the transformer and water-cooling cabinets.

Team experience

Close-up of the cabinet finish after the work.

Technicians experienced in preventive maintenance, corrective maintenance and painting

Finishing work included preparing the surfaces of electrical cabinets.

Rotor with blades beside the cranes used for lifting.

Blade replacement on Goldwind GW 2.5 MW turbines

The work included removing the blades from the hub and using cranes during the operation.

Crane lifting a tower section.

Supervision of turbine lifts

The supervised lifts included hoisting tower sections with a crane.

Hydraulic tensioners fitted to the bolts at the tower base.

Bolt tensioning and hydraulic tensioning

The team used hydraulic tensioners on the bolts at the base of the tower.

Generator suspended from a crane beside the wind turbine.

Generator replacement on a SUZLON S88 2.1 MW turbine

The operation included lifting the generator with a crane positioned next to the turbine.

Close-up of the blade repair area.

Technicians certified by SINOMA WIND POWER BLADE Co., Ltd. to repair blades on Goldwind GW 2.5 MW turbines

Close-up of a blade tip after modification.

Blade tip retrofits on Goldwind GW 2.5 MW turbines

The team measured the blade tip area during the retrofit.

Crane and turbine component on a transport vehicle.

Experience unloading wind turbine components

The team took part in crane-assisted unloading of components delivered by truck.