October–December 2020
Rotor removal and reinstallation for bearing replacement
SUZLON 2.1 MW · Rivas, Nicaragua
The team removed the rotor to replace the bearings and used a crane to reinstall it.
October–December 2020
SUZLON 2.1 MW · Rivas, Nicaragua
The team removed the rotor to replace the bearings and used a crane to reinstall it.
October–November 2025
Villonaco Wind Farm · Loja, Ecuador
The team installed the 3S LIFT automated climbing system on the ladder inside the tower.
October–December 2023
Coromuel Wind Farm · Baja California, Mexico
The installation added a climb-assist device to the ladder inside the turbine.
September–November 2021
Gamesa · Costa Rica
The team replaced the cylinders in the system that controls blade pitch.
Inspection and maintenance work covered 112 service lifts across three wind farms.
Training at 3S LIFT Industry · Beijing, China · 2017
2026
Orosí Wind Farm · Costa Rica
The team worked on the metal structure at the substation entrance.
October 2025–June 2026
Tilarán, Costa Rica
August–September 2019
Goldwind Phase II · Penonomé, Coclé, Panama
Four technicians worked on the entrance platform, removing paint marks from the floor. The project also included refinishing the main control cabinets.
April–May 2016
Goldwind Phase I · Penonomé, Coclé, Panama
The work included fitting metal supports at the foot of the internal ladders.
April–September 2015
Goldwind Phase II · Penonomé, Coclé, Panama
The documented components include metal bases and cable turnbuckles.
January–February 2015
Goldwind Phase I · Penonomé, Coclé, Panama
The team treated corrosion on bolts and nuts and polished the affected areas.
Dec–Feb 2015
Goldwind Phase I · Penonomé, Coclé, Panama
The team replaced the brake calipers in the nacelle yaw system.
December 2014
Goldwind Phase 1 · Penonomé, Coclé, Panama
Technicians with IRATA Level 1 and Level 2 rope access qualifications cleaned section T3 and part of section T2.
September–December 2014
Goldwind Phase 1 · Penonomé, Coclé, Panama
The team welded the supporting structure and installed the dehumidifier, mist eliminator, sensors and electrical connections.
September–October 2014
Goldwind Phase I · Penonomé, Panama
The team machined grooves into the nacelle yaw disc.
The team assisted with replacing 185 mm power cables and upgrading the transformer and water-cooling cabinets.
Finishing work included preparing the surfaces of electrical cabinets.
The work included removing the blades from the hub and using cranes during the operation.
The supervised lifts included hoisting tower sections with a crane.
The team used hydraulic tensioners on the bolts at the base of the tower.
The operation included lifting the generator with a crane positioned next to the turbine.
The team measured the blade tip area during the retrofit.
The team took part in crane-assisted unloading of components delivered by truck.