Rotor removal and reinstallation for bearing replacement

Suzlon rotor and crane during the lifting operation in Rivas.Blade bearing suspended beside the hub.Technicians working at the blade root during the operation.

Nicaragua

SUZLON 2.1 MW · Rivas

We removed the rotor of a 2.1 MW Suzlon turbine in Rivas to access and replace its bearings. After the replacement, we used a crane to reinstall the rotor assembly.