October–December 2020
Nicaragua
Rotor removal and reinstallation for bearing replacement
SUZLON 2.1 MW · Rivas
We removed the rotor of a 2.1 MW Suzlon turbine in Rivas to access and replace its bearings.
October–December 2020
Nicaragua
SUZLON 2.1 MW · Rivas
We removed the rotor of a 2.1 MW Suzlon turbine in Rivas to access and replace its bearings.
October–November 2025
Ecuador
Villonaco Wind Farm · Loja
At Villonaco Wind Farm in Loja, we installed the 3S LIFT Climb Auto System (CAS).
October–December 2023
Mexico
Coromuel Wind Farm · Baja California
At Coromuel Wind Farm in Baja California, we installed a Climb Assist unit on the tower ladder.
September–November 2021
Costa Rica
Gamesa
We replaced hydraulic pitch cylinders on Gamesa wind turbines.
Panama · Mexico · Nicaragua
Our certified technicians inspected and carried out annual maintenance on 112 service lifts across three wind farms.
Training at 3S LIFT Industry · Beijing, China · 2017
2026
Costa Rica
Orosí Wind Farm
At Orosí Wind Farm, we repaired the steel structure at the substation entrance.
October 2025–June 2026
Costa Rica
Tilarán
We provided electrical technicians for emergency support at the Tilawind Wind Farm substation in Tilarán.
January–March 2020
Costa Rica
TRANSBIAGA
A certified crane operator’s assistant from our team supported the TRANSBIAGA operator during crane operations.
August–September 2019
Panama
Goldwind Phase II · Penonomé, Coclé
Four technicians restored entrance platforms and the finish on main control cabinets during Goldwind Phase II in Penonomé.
April–May 2016
Panama
Goldwind Phase I · Penonomé, Coclé
We installed and maintained the steel bases that anchor internal tower ladders on Goldwind turbines in Penonomé.
April–September 2015
Panama
Goldwind Phase II · Penonomé, Coclé
We fabricated and repaired structural parts for Goldwind Phase II turbines in Penonomé.
January–February 2015
Panama
Goldwind Phase I · Penonomé, Coclé
We treated corrosion on bolts and nuts inside Goldwind turbines in Penonomé.
Dec–Feb 2015
Panama
Goldwind Phase I · Penonomé, Coclé
We replaced yaw brake calipers on Goldwind turbines.
December 2014
Panama
Goldwind Phase 1 · Penonomé, Coclé
IRATA Level 1 and Level 2 technicians cleaned the interiors of Goldwind towers in Penonomé.
September–December 2014
Panama
Goldwind Phase 1 · Penonomé, Coclé
We installed the environmental control system on Goldwind turbines in Penonomé.
September–October 2014
Panama
Goldwind Phase I · Penonomé
During Goldwind Phase I in Penonomé, we machined grooves into the turbines’ yaw discs.
Panama
We replaced generator power cable lugs in a hot-work intervention.
Panama
We carried out two scheduled services on Goldwind GW 2.5 MW turbines: the 500-hour service and six-month maintenance visits.
Panama
We supported Goldwind Services Company Panamá on Phase I electrical upgrades.
Panama
Our technicians have experience in preventive and corrective wind turbine maintenance and industrial painting.
Our personnel have supervised turbine lifting operations, including lifts of tower sections.
Our team has carried out hydraulic bolt tensioning at wind tower bases.
Our technicians have experience replacing generators on 2.1 MW Suzlon S88 turbines.
Our technicians have worked on blade tip retrofits for Goldwind GW 2.5 MW turbines.
Our personnel have experience receiving and unloading wind turbine components delivered by road.